Why QC matters more than price
Price is visible, rework is hidden. Late defects burn freight upgrades, replacements, and reputation. A simple, repeatable QC plan turns unknowns into checkpoints that keep orders moving without drama.
The three checkpoints that catch 95% of issues
Pre-production (PP)
- Verify materials, finishes, and packaging against the signed spec and golden sample.
- Confirm tooling readiness and first-article plan with the factory.
- Lock critical tolerances and test methods (color, load, fit, rub, etc.).
During production (DUPRO)
- Inspect while 20–50% is made to catch trend defects early.
- Check process controls, not only finished units (fixtures, jigs, mixing ratios).
- Verify in-line tests and rework handling.
Pre-shipment (PSI)
- Random sampling per AQL; confirm labeling, manuals, barcodes, and carton integrity.
- Open master cartons and function test a sample of units.
- Shipment approval only after PASS with agreed minor/major limits.
What to prepare before PP
- Spec pack: drawings/CAD, materials, finishes, packaging dielines, labels.
- Golden sample: signed and dated, stored at both sides.
- QC checklist: visuals + measurable criteria for each check.
- Defect list: define critical/major/minor with examples to align expectations.
AQL basics without the jargon
Use standard tables (ISO 2859) and stick to one sampling level for consistency. Typical consumer goods start at II / 0.65–1.5 depending on risk. The key is consistency: same level, same limits, every order, so trends are obvious.
Common pitfalls and how to avoid them
- Approving samples without a written spec → write it, sign it, version it.
- Skipping DUPRO → issues surface too late. Always check mid-run.
- Changing finishes mid-order → re-approve with quick lab panels first.
- Unclear packaging → do a carton drop test and photograph the result.
Who runs the inspections?
Options: your own staff, the factory’s QC (with oversight), or a third-party agency. We typically combine a factory PP with our DUPRO and PSI, plus surprise follow-ups for new suppliers.
Baseline checklist you can copy
- Sign spec + golden sample; share a photo log with the factory.
- Schedule PP, DUPRO, PSI at order confirmation.
- Prepare AQL sheet and defect list; agree pass/fail thresholds.
- Run DUPRO when 20–50% is complete; correct at source.
- Approve shipment only after PSI PASS with sealed samples.